1 安裝時高強螺栓應自由穿入孔內,不得強行敲打。扭剪型高強螺栓的墊圈安在螺母一側,墊圈孔有倒角的一側應和螺母接觸,不得裝反(大六角頭、高強螺栓的墊圈應安裝在螺栓頭一側和螺母一側,墊圈孔有倒角一側應和螺栓頭接觸,不得裝反)。

1. During installation, high-strength bolts should be freely penetrated into the hole, and forced tapping is not allowed. The washer of torsion shear high-strength bolt shall be installed on the side of the nut, and the side with chamfer in the washer hole shall be in contact with the nut and shall not be installed upside down (the washer of large hexagon head and high-strength bolt shall be installed on the side of the bolt head and the nut, and the side with chamfer in the washer hole shall be in contact with the bolt head and shall not be installed upside down).
2 螺栓不能自由穿入時,不得用氣割擴孔,要用絞刀絞孔,修孔時需使板層緊貼,以防鐵屑進入板縫,絞孔后要用砂輪機孔邊毛刺,并鐵屑。
2. When bolts cannot be penetrated freely, gas cutting shall not be used to ream holes, and reaming with a reamer shall be used. When repairing holes, the plate layer shall be close to prevent iron filings from entering the plate seam. After reaming holes, use a grinder to remove burrs at the hole edge and remove iron filings.
3 螺栓穿入方向宜一致,穿入高強螺栓用扳手緊固后,再卸下臨時螺栓,以高強螺栓替換。不得在雨天安裝高強螺栓,且摩擦面應處于干燥狀態(tài)。
3 bolts should be threaded in the same direction. After threading high-strength bolts and tightening them with a wrench, remove the temporary bolts and replace them with high-strength bolts. High strength bolts shall not be installed in rainy days, and the friction surface shall be dry.
4.高強螺栓的緊固:必須分兩次進行,次為初擰。初擰緊固到螺栓標準軸力(即設計預拉力)的60%~80%,初擰的扭矩值不得小于終擰扭矩值的30%。第二次緊固為終擰,終擰時扭剪型高強螺栓應將梅花卡頭擰掉。為使螺栓群中所有螺栓均勻受力,初擰、終擰都應按一定順序進行。一般接頭:應從螺栓群中間順序向外側進行緊固。從接頭剛度大的地方向不受約束的自由端進行。從螺栓群向四周擴散的方式進行。
4. Fastening of high-strength bolts: it must be carried out in two times, and the first time is initial tightening. The initial tightening shall be tightened to 60% - 80% of the standard axial force (i.e. design pretension) of the bolt, and the torque value of the initial tightening shall not be less than 30% of the torque value of the final tightening. The second tightening is the final tightening. During the final tightening, the Torx clamp shall be screwed off. In order to make all bolts in the bolt group bear the force evenly, the initial tightening and final tightening should be carried out in a certain order. General joints: tighten from the middle of the bolt group to the outside. From the place with large joint stiffness to the unrestrained free end. From the center of the bolt group to the surrounding areas.
以上就是為大家介紹的有關扭剪扳手的詳細的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務.http://wrjzzs.com
The above is a detailed introduction to the torsion shear wrench, which I hope will be helpful to you If you have any questions, please contact us We will provide you with professional service http://wrjzzs.com